PAST PERFORMANCE
GSE/AGE Support and Maintenance FA-18 and QF-16 Programs
Boeing Cecil Commerce Center Jacksonville, FL (2005 - Present)
Indefinite contract maintaining both Government and Boeing owned Aircraft Support Equipment and Tooling. Contract requires maintenance and control for Boeing/Government aircraft support/calibration equipment and vehicle maintenance for equipment located at Boeing Aerospace Support Center, at Cecil Jacksonville, FL.
CH-47F Bracket and Install Drawing update CH-47F
Goodrich Aerospace IMDS/HUMS (2012)
Provided Contractor Engineering/Drawing Support the Goodrich Aerospace Vibration Diagnostics (IMDS/HUMS) System on the CH-47F.
(On-Time and within budget)
FIELD INSTALLATION AND MODIFICATION
UH-60L
FORT CAMPBELL, KY (2004)
Goodrich Aerospace IMDS/HUMS Follow-on Effort of Mosul Installs
10 A/C
Provided Contractor Field Team to install the Goodrich Aerospace Vibration Diagnostics (IMDS/HUMS) System on the UH-60L, for the 101st ID’s 9th Battalion.
(On-Time and within budget)
FIELD INSTALLATION AND MODIFICATION
UH-60L
MOSUL, IRAQ (2003-2004)
Goodrich Aerospace IMDS/HUMS Production Install
20 A/C
Provided Contractor Field Team to install the Goodrich Aerospace Vibration Diagnostics (IMDS/HUMS) System on the UH-60L, while embedded with the 101st ID’s 9th Battalion, in-country. ATSG was the first contractor to conduct a full installation on active aircraft during an armed conflict. Significantly, the company was able to successfully reduce install time by 10 days. The original 14 day modification was reduced to an aircraft move every four days. From contract award, ATSG’s team was mobilized and in-theater in only 21 days.
(Ahead of Schedule and within budget)
FIELD INSTALLATION AND MODIFICATION
UH-60A
ATTC FORT RUCKER (2001)
Goodrich Aerospace IMDS/HUMS Prototype Install
2 A/C
Provided Contractor Field Team and On-Site Management required to install the Goodrich Aerospace Vibration Diagnostics (IMDS/HUMS) System on UH-60A.
(On-Time and within budget)
FIELD INSTALLATION AND MODIFICATION
MH-53
MCAS NEW RIVER (2000-2001)
Goodrich Aerospace IMDS/HUMS Production Install
4 A/C
Provided Contractor Field Team to install the Goodrich Aerospace Vibration Diagnostics (IMDS/HUMS) System on MH-53.
(On-Time and within budget)
FIELD INSTALLATION AND MODIFICATION
SH-60B
NAS PAX RIVER (2000)
Goodrich Aerospace IMDS/HUMS Prototype Install
1 A/C
Provided Contractor Field Team to install the Goodrich Aerospace Vibration Diagnostics (IMDS/HUMS) System on the SH-60)
(On-Time and within budget)
FIELD INSTALLATION AND MODIFICATION
MH-53
NAS PAX RIVER (2000)
Goodrich Aerospace IMDS/HUMS Prototype Install
1 A/C
Provided Contractor Field Team to install the Goodrich Aerospace Vibration Diagnostics (IMDS/HUMS) System on MH-53.
(On-Time and within budget)